Open

Electricity procurement approaches

Consultation on a proposed Technical Notice

This consultation will close in 35 days - responses must be submitted by 30 December 2026, 23:59 GMT
Overview
Documents
Outcomes

Background

During its assessments of carbon-crediting methodologies, the Integrity Council identified questions about how electricity procurement approaches are used to calculate project emissions from electricity consumption.

Some methodologies allow electricity procurement arrangements to support the use of an emission factor that is lower than the applicable grid emission factor. This can materially affect the quantification of project emissions, and in turn the quantity of emission reductions or removals credited.

The Integrity Council is therefore consulting on a proposed Technical Notice setting out how the relevant Assessment Framework requirements should be applied in these circumstances. A Technical Notice is a Tier 2 instrument under the CCP Rule Architecture.

Scope of the consultation

The proposed Technical Notice considers the conditions that should be met for projects to be able to use electricity procurement approaches as a basis for applying an emission factor below the applicable grid emission factor.

The proposed Technical Notice considers several factors relevant to robust quantification, including:

  • the link between the procurement arrangement and the generation asset;
  • the geographic relationship between generation and consumption;
  • temporal matching between generation and consumption;
  • exclusive attribution of environmental attributes associated with the procured electricity; and
  • whether an additionality demonstration should be required for the relevant generation asset or procurement instrument.

The Integrity Council is seeking views on whether these factors provide an appropriate basis for robust quantification, as well as on how the proposed approaches may work across different electricity markets.

The consultation also seeks feedback on the proposed application and transition arrangements, including how an adopted Technical Notice should apply to methodologies that are already CCP-Approved, methodologies under assessment and future submissions.

What happens next

The consultation is open until 30 December 2026, 11:59 pm Pacific Time. Responses should be submitted through the online consultation form.

The Integrity Council will consider the responses received and publish these alongside a high-level summary. It will then determine whether and how the proposed Technical Notice and its application and transition measures should be refined before proceeding through the Integrity Council’s governance process.